New Maintenance Garage - Thunder Bay Hydro
H. Bradford Green Architect Inc was retained by Tom Jones Corporation to design a New Maintenance Garage for Thunder Bay Hydro Electricity Distribution Inc.
The 728 s.m. facility contains four service bays in the main garage area, a welding bay, a wash bay, and mezzanine storage. The barrier-free office area houses a private office, lunchroom, locker room, and washroom/shower room, laundry room. The mechanical/ electrical room is located on a partial second floor above the office area. A 5,000 kg overhead rail crane serves the main garage and storage mezzanine: while a 1,000 kg column mounted jib crane serves the welding bays.
The pre-engineered building shell, with RSI 3.5 (R20) insulation provides a suitable blend of durability and efficiency. HVAC systems include an air handler with hydronic heating coil and an HRV to serve the office area, gas fired unit heaters in the garage bays and a gas fired air handler for the make-up air system with gas fired condensing boilers, a gas fired air handler and an HRV.
Construction of this design-build project as successfully completed in December 2013.
Project Details:
- Tom Jones Corporation
- Project Size: 728 s.m.
- Project Value: $3,081,000
- Contractor: Tom Jones Corporation
- Completed: December 2013
- Location: Thunder Bay, ON